Supply chain consulting

18 years in industrial supply chain. 3 weeks to read yours on 40 points.

5 conversations, a written report, and what to fix first. Without touching your systems.

MONDAY · 09:10 Monday, 9:10 the part is not on the bench LINE-SIDE FULLFULLEMPTY The line stops. Nobody knew. NO SIGNAL CAME BACK UPSTREAM
Monday 9:10 · next Monday, a different part

How we can work together

3 weeks · remote€4,500

Diagnostic

40 points, the whole operation. 5 conversations, and you know where you stand and what the gaps are worth.

Where you stand, point by point 40 points, the whole operation — 3 weeks TARGET Engineering changes 2.5Forecasting 1.5Planning parameters 2.0Ordering 1.0Shortages 1.8Supplier performance 2.2 WHERE YOU STAND · WHAT TO FIX FIRST two readings per point: what is in place, and what it produces
Your team spends5 hours of interviews
At the endYou know where you stand
Price€4,500
How it runs
9 weeks · remote€12,500

Project

One flow taken apart. We find why it fails, write how it should run, and make sure the new way holds before I leave.

One flow, opened to the bottom one point of the 10 domains — 9 weeks THE 10 DOMAINS 01020304050607080910 WEEKS 1-3 how it really runs — measured WEEKS 4-6 why — the cause, not the symptom WEEKS 7-9 the new standard, andadherence checked AT THE END, IT WORKS DIFFERENTLY I leave once the new way is being followed
Your team spends1 week measuring, 3 workshops
At the endIt works differently
Price€12,500
How it runs

Most people start with the diagnostic. If you already know exactly what is broken, go straight to a project.

You may recognise this too

Your suppliers complain about your forecast, and they are not entirely wrong

Nobody can tell you what the stock that has not moved in a year is worth

The same problem comes back two quarters after it was fixed

TUESDAY Tuesday 3 calls about the same part SAME PART, THREE CHASES MISSED CALLS PROMISED DATE ? Everyone chases. No date. 3 CALLS · 1 PART · 0 COMMITMENT WEDNESDAY Wednesday it leaves tonight SPOT SHIPMENT 4× FREIGHT Approved in ten minutes. 4× FREIGHT · IN NO BUDGET LINE THURSDAY Thursday the weekly meeting ACTION LIST ACTIONOWNERDATE ???????? A list, not a decision. NO OWNER · NO DATE · SAME LIST NEXT WEEK
The same week, three more times

Everyone knows their segment. Nobody sees the whole.

The picture exists — in pieces, in different heads. Laying it side by side is a job in itself, and it never reaches the top of anyone’s list.

JULIEN NAVID
About

18 years running industrial supply chains. Now I improve the one you already have.

15 years in the aviation industry, 3 in electronics, 12 of them abroad — Asia and Canada. Two ways to use that: a complete view of where you stand, or one flow taken apart and made to work.

My background
Julien Navid
01 $0M of raw material I was accountable for
02 33%0% late orders, in one year
03 0% fewer missing parts
04 0 h released by automation, first year

Who this is for

Industrial companies of 50 to 500 million in revenue, with their own supply chain and no group function above them telling them how to run it.

Usually a plant or operations director who knows something is not right, and never had time to look at the whole of it.

Who it is not for

If you already run a maturity framework with a continuous improvement team, I will not tell you anything new.

If you want someone to execute the plan afterwards, that is not what I do.

Start with 30 minutes No charge. If I am not the right fit, I will say so on the call.
The framework

The Operating Standard Index

10 domains, 4 cross-cutting axes, 40 observation points. Every point is rated on the same 5 tiers — Ad hoc, Written, Applied, Measured, Self-correcting.

Select any point to see what it covers — all 40 are clickable. One is opened in full, with its 5 descriptors.

I 01 02 03 07 06 04 08 09 10 One part, end to end — and the loop that should come back Downstream flow runs every day. The feedback loop is what I come to measure — and it is broken in most plants. DEMAND SIGNAL → PURCHASE ORDER → SHIPMENT → STOCK → LINE-SIDE THE SIGNAL Engineering changesForecast & net requirementsPlanning parameters SUPPLY Sourcing & supplier panelSupplier performance (OTD)Orders & expediting PHYSICAL FLOW Transport & logisticsStock & dead stock SERVICE& SHORTAGES the empty bin at the station FILL RATE MANAGEMENT SYSTEM Routines, ownership, escalation, KPIs — it produces nothing, it holds the three above. THE FOOTING Feedback loop — what actually happened, back to the signal. Interrupted at every handover. 01 02 03 07 06 04 08 09 10 One part, end to end Flow runs. The loop back does not. SIGNAL → ORDER → SHIPMENT → STOCK → LINE THE SIGNAL Engineering changesForecast & requirementsPlanning parameters SUPPLY Sourcing & panelSupplier performanceOrders & expediting PHYSICAL FLOW Transport & logisticsStock & dead stock SERVICE & SHORTAGES the empty bin — where we start MANAGEMENT SYSTEM routines, ownership, escalation — it holds the three LOOP BROKEN
The flow forward always turns · the return loop is what I measure
Process and
standard
Information
and decision
Performance
management
Skills and
ownership
The second reading

What is in place, and what it produces

The tiers measure what your organisation has put in place, not the result you get. A company can have a written, applied, measured standard and still miss its dates — another hits every date with nothing written down.

So every point carries a second reading, scored on what I observe, not what you measure.

Unknown Nothing available makes the result assessable. Below Short of your own target, or of what the operation needs. Expected At the level it should be. Ahead Above it, with room.
Where the two meet
Result below
Result at or above
Measured
Self-correcting

Paper Standard

The standard exists and is not producing. Usually a measure that nobody acts on.

Self-sustaining

It holds on its own. Leave it alone and spend your effort elsewhere.

Ad hoc
Written
Applied

Groundwork

Nothing written, nothing working. Rare, and it tells you where to start.

Held Together

It works, and nobody can explain why. The result is real — it rests on a few people, not on the system.

Most points in most companies land bottom right. Not a criticism — your results are real and your people are good. Worth knowing which ones, because those move when someone leaves.

3 weeks · remote €4,500

Diagnostic

A complete view of your supply chain, built from 5 conversations: where you stand on 40 points, what the gaps are worth, and what to do first. Nothing changes during these 3 weeks — that comes after.

Everything runs remotely. 5 hours of your team's time — no visit, no data extract.

Five conversations in, three priced findings out 3 weeks, nothing else asked of you INPUTSCORINGFINDINGSSEQUENCE PLANNINGPURCHASINGLOGISTICSPRODUCTIONYOU 5 × 1 HOUR 01020304050607080910ABCD 40 POINTS — 10 DOMAINS × 4 AXES two readings each: what is in place, what it produces A PROCESS · B INFORMATION · C PERFORMANCE · D OWNERSHIP 01 Premium freight 02 Dead stock 03 Line stoppages 3 FINDINGS, PRICED each one priced, with the assumptions written down Fix the signal NAMED OWNERClean the parameters NAMED OWNERHold the routine NAMED OWNER D0D30D60D90 ONE NAMED OWNER PER ACTION Three weeks. Five hours of your team’s time. Nothing else asked of you. 5 in, 3 out 5 conversations · 40 points · 3 findings · 90 days INPUT PLANPURCHLOGPRODYOU 5 × 1 HOUR SCORING 40 POINTS — 10 DOMAINS × 4 AXES 3 FINDINGS, PRICED Premium freightDead stockLine stoppages SEQUENCE D0D30D60D90 3 weeks · 5 hours of your team’s time
Vague in, precise out
01 5 conversations 1 hour each, remote
02 40 points scored two readings each
03 3 findings, priced assumptions shown
04 90-day sequence named owner per action

How it runs

1

A first conversation — 30 minutes, no charge, and I say if I am not the right fit.

2

5 conversations of 1 hour — planning, purchasing, logistics, production, and you.

3

Scoring — 40 points, two readings each; where the two disagree is the useful part.

4

Read-out, 2 hours — 3 findings, the money attached, the first 90 days. We spend most of it arguing.

5

A call 2 weeks later, once you have shown it to people. No charge.

What you get

A written report — short enough to be read, detailed enough to act on

Your position on 40 points, domain by domain

3 findings, each with a figure and the assumptions behind it

A 90-day sequence, a named owner per action

What it costs you

5 hours of your team's time, spread over 3 weeks

No IT involvement

No data extract to prepare

No visit to host

€4,500 Fixed. 3 weeks from the first conversation. Excluding VAT.
Discuss a diagnostic
9 weeks · remote €12,500

Project

A flow that does not work — too slow, too manual, or breaking the same way every quarter. We find why, fix how it should run, and make sure the new way holds before I leave.

It assumes you already know which flow. If you are not sure, start with a diagnostic.

When this is the right thing

A flow that takes longer than anyone can explain

A problem that comes back after every fix

A standard that exists on paper and is not followed

Information that has to be rebuilt by hand before anyone can decide

How it runs

1

Who it is for — I interview the people who receive the output. The gap between what they need and what they get is the brief.

2

Scoping — a structured map of the process, bounded by what the receiving side just said.

3

How it really runs — your team measures the flow for a week and maps it with me. A map they draw is theirs, which is why the standard survives.

4

Why — where the time goes, where information stops, root cause on the 2 or 3 heaviest.

5

How it should run — the target flow, and the wording of the standard your team will work from.

6

Making it stick — written, applied, then measured. The measure has to produce an action.

How we know it worked

The receiving side says something changed — same interviews as week 1. The process moves to written, applied, measured. The target position is in the contract.

Two ways in

After a diagnostic, the process is named and the money counted — we start at step 2.

If you already know your problem, a half-day scoping at €1,200, deducted from the project if it goes ahead.

What I do not do

I do not execute

I do not run your team

I do not sit in your internal meetings

Your named owners carry the actions

€12,500 Fixed. 9 weeks, fixed end date. One flow, one site, one team. Scoping €1,200, deducted. Excluding VAT.
Discuss a project
Background

Julien Navid

18 years in procurement operations and supply chain — 15 in the aviation industry, 3 in electronics. 12 of them abroad: Asia and Canada.

Julien Navid
Running the
operation

I have led up to 60 people across 3 sites, 3 managers reporting to me, a €5M budget, 11 production groups on 2 shifts.

In aviation I carried 2,000+ part numbers from 30+ suppliers, 55,000 order lines a year, €4M of stock a month. Automated ordering to 94%, late published orders from 33% to 9%, missing parts down 65% in a year.

In Canada I was accountable for $400M of raw material and 7,000 parts through a supply transformation, leading a team of 10. I deployed 17 software robots: 3,000 hours released the first year, payback under 2 months.

When it
goes wrong

I ran a 4-month recovery on a failing operation in another division, reporting weekly to its CEO until it was stable. I diagnosed ordering and logistics; the recovery plan came out of that diagnosis.

Asking the
right questions

As a Lean expert I ran 19 workshops, coached senior leaders, and built the Senior VP of Procurement Operations' control room. I interviewed every plant manager in the group for a Voice of Customer exercise.

That is where the framework comes from. I have been diagnosing operations by conversation for 14 years — the 40 points are what I learned to ask.

Information,
and Asia

I led an organisational efficiency project sponsored by a Programme Senior VP: 6 working groups on how information moves between functions. One outcome — a cross-functional certification cycle from over 12 months to 9.

Before that, 7 years in Singapore, China, Hong Kong and Japan — Lean supplier development across 9 plants, 300 people trained at 60 suppliers, defect rates down 70%.

How I
work

I run this practice alongside a full-time operations role. That is deliberate, and it shapes the offer: remote, fixed format, fixed end date, and few engagements a year.

It also means I am still doing the work, not remembering it. My questions come from problems I am handling this month, not a job I left five years ago.

Supply chain consulting · Toulouse, France © 2026 Julien Navid. All rights reserved. hello@juliennavid.comLinkedIn